
crystal-lang.org/2021/09/30/preparing-1.2
Preview meta tags from the crystal-lang.org website.
Linked Hostnames
16- 27 links tocrystal-lang.org
- 5 links togithub.com
- 1 link todiscord.gg
- 1 link todisqus.com
- 1 link toforum.crystal-lang.org
- 1 link tofosstodon.org
- 1 link togitter.im
- 1 link tohub.docker.com
Thumbnail

Search Engine Appearance
Preparing for Crystal 1.2
We have reached the feature freeze period for Crystal 1.2. From now on, only bug fixes will be merged into master. The release is scheduled for the 13th of October. As usual, we invite everyone to test our latest nightly release to ensure that we haven’t included a breaking change by mistake (docker 🐳, OS packages 💻).
Bing
Preparing for Crystal 1.2
We have reached the feature freeze period for Crystal 1.2. From now on, only bug fixes will be merged into master. The release is scheduled for the 13th of October. As usual, we invite everyone to test our latest nightly release to ensure that we haven’t included a breaking change by mistake (docker 🐳, OS packages 💻).
DuckDuckGo

Preparing for Crystal 1.2
We have reached the feature freeze period for Crystal 1.2. From now on, only bug fixes will be merged into master. The release is scheduled for the 13th of October. As usual, we invite everyone to test our latest nightly release to ensure that we haven’t included a breaking change by mistake (docker 🐳, OS packages 💻).
General Meta Tags
10- titlePreparing for Crystal 1.2 - The Crystal Programming Language
- charsetutf-8
- generatorJekyll v4.4.1
- authorBeta Ziliani
- descriptionWe have reached the feature freeze period for Crystal 1.2. From now on, only bug fixes will be merged into master. The release is scheduled for the 13th of October. As usual, we invite everyone to test our latest nightly release to ensure that we haven’t included a breaking change by mistake (docker 🐳, OS packages 💻).
Open Graph Meta Tags
7- og:titlePreparing for Crystal 1.2
og:locale
en_US- og:descriptionWe have reached the feature freeze period for Crystal 1.2. From now on, only bug fixes will be merged into master. The release is scheduled for the 13th of October. As usual, we invite everyone to test our latest nightly release to ensure that we haven’t included a breaking change by mistake (docker 🐳, OS packages 💻).
- og:urlhttps://crystal-lang.org/2021/09/30/preparing-1.2/
- og:site_nameThe Crystal Programming Language
Twitter Meta Tags
3- twitter:cardsummary
- twitter:site@CrystalLanguage
- twitter:creator@Beta Ziliani
Link Tags
8- alternate/feed.xml
- canonicalhttps://crystal-lang.org/2021/09/30/preparing-1.2/
- icon/favicon.png
- preload/assets/fonts/roboto/roboto-v30-latin-300.woff2
- preload/assets/fonts/roboto/roboto-v30-latin-regular.woff2
Links
46- http://irclog.crystal-lang.org
- https://crystal-lang.org
- https://crystal-lang.org/2021/08/24/triage-role
- https://crystal-lang.org/2021/12/29/crystal-i
- https://crystal-lang.org/api