math.answers.com/math-and-arithmetic/Can_you_feed_two_200_amp_breaker_boxes_from_one_meter
Preview meta tags from the math.answers.com website.
Linked Hostnames
8- 32 links tomath.answers.com
- 21 links towww.answers.com
- 1 link totwitter.com
- 1 link towww.facebook.com
- 1 link towww.instagram.com
- 1 link towww.pinterest.com
- 1 link towww.tiktok.com
- 1 link towww.youtube.com
Thumbnail

Search Engine Appearance
Can you feed two 200 amp breaker boxes from one meter? - Answers
No, for a single phase 120/240 volt service, a 200 amp meter is the maximum for that type of service. With two 200 amp loads from the one meter there is the possibility of drawing above the total the meter will handle. Any service size over 200 amps has to use current Transformers (CT's) and if the voltage is over 240 volts, potential transformers (PT's). It can be done with primary metering but it has to be on a private High Voltage line. 50KVA transformers can be added to the primary line, each with an output of 200 amps. One of the draw backs is that excitation amperage of the transformers is also monitored by the primary metering. This is also added into the total cost of power used. In the U.S. there is a meter available to build a 400 amp single phase service and use 2- 200 amp main breaker panels in paralell. The meter sockets have paralell lugs for all conductors. I have built several services this size and just recently installed a stand-by generator on one.
Bing
Can you feed two 200 amp breaker boxes from one meter? - Answers
No, for a single phase 120/240 volt service, a 200 amp meter is the maximum for that type of service. With two 200 amp loads from the one meter there is the possibility of drawing above the total the meter will handle. Any service size over 200 amps has to use current Transformers (CT's) and if the voltage is over 240 volts, potential transformers (PT's). It can be done with primary metering but it has to be on a private High Voltage line. 50KVA transformers can be added to the primary line, each with an output of 200 amps. One of the draw backs is that excitation amperage of the transformers is also monitored by the primary metering. This is also added into the total cost of power used. In the U.S. there is a meter available to build a 400 amp single phase service and use 2- 200 amp main breaker panels in paralell. The meter sockets have paralell lugs for all conductors. I have built several services this size and just recently installed a stand-by generator on one.
DuckDuckGo
Can you feed two 200 amp breaker boxes from one meter? - Answers
No, for a single phase 120/240 volt service, a 200 amp meter is the maximum for that type of service. With two 200 amp loads from the one meter there is the possibility of drawing above the total the meter will handle. Any service size over 200 amps has to use current Transformers (CT's) and if the voltage is over 240 volts, potential transformers (PT's). It can be done with primary metering but it has to be on a private High Voltage line. 50KVA transformers can be added to the primary line, each with an output of 200 amps. One of the draw backs is that excitation amperage of the transformers is also monitored by the primary metering. This is also added into the total cost of power used. In the U.S. there is a meter available to build a 400 amp single phase service and use 2- 200 amp main breaker panels in paralell. The meter sockets have paralell lugs for all conductors. I have built several services this size and just recently installed a stand-by generator on one.
General Meta Tags
22- titleCan you feed two 200 amp breaker boxes from one meter? - Answers
- charsetutf-8
- Content-Typetext/html; charset=utf-8
- viewportminimum-scale=1, initial-scale=1, width=device-width, shrink-to-fit=no
- X-UA-CompatibleIE=edge,chrome=1
Open Graph Meta Tags
7- og:imagehttps://st.answers.com/html_test_assets/Answers_Blue.jpeg
- og:image:width900
- og:image:height900
- og:site_nameAnswers
- og:descriptionNo, for a single phase 120/240 volt service, a 200 amp meter is the maximum for that type of service. With two 200 amp loads from the one meter there is the possibility of drawing above the total the meter will handle. Any service size over 200 amps has to use current Transformers (CT's) and if the voltage is over 240 volts, potential transformers (PT's). It can be done with primary metering but it has to be on a private High Voltage line. 50KVA transformers can be added to the primary line, each with an output of 200 amps. One of the draw backs is that excitation amperage of the transformers is also monitored by the primary metering. This is also added into the total cost of power used. In the U.S. there is a meter available to build a 400 amp single phase service and use 2- 200 amp main breaker panels in paralell. The meter sockets have paralell lugs for all conductors. I have built several services this size and just recently installed a stand-by generator on one.
Twitter Meta Tags
1- twitter:cardsummary_large_image
Link Tags
16- alternatehttps://www.answers.com/feed.rss
- apple-touch-icon/icons/180x180.png
- canonicalhttps://math.answers.com/math-and-arithmetic/Can_you_feed_two_200_amp_breaker_boxes_from_one_meter
- icon/favicon.svg
- icon/icons/16x16.png
Links
59- https://math.answers.com
- https://math.answers.com/math-and-arithmetic/Abe_cut_a_large_circle_out_of_a_piece_of_heavy_cardboard._He_was_going_to_use_it_to_demonstrate_something_he_had_been_studying_to_his_eight-year-old_sister._He_held_the_circle_up_so_it_was_directly_fa
- https://math.answers.com/math-and-arithmetic/Can_you_feed_two_200_amp_breaker_boxes_from_one_meter
- https://math.answers.com/math-and-arithmetic/How_do_you_write_the_number_1105_in_scientific_notation
- https://math.answers.com/math-and-arithmetic/How_is_32.4_billion_written